Residential in Hanwell

CA$949,900

18 Pelican, E3E 2L8, Hanwell, NB

Residential for sale in Hanwell, 18 Pelican, E3E 2L8

18 Pelican, E3E 2L8, Hanwell, NB

CA$949,900

4Bed
4Bath
Type: Residential

Description

Sitting on 2.15 acres, surrounded by mature trees and positioned on a quiet court in Hanwell NB, this home offers so much privacy. This large 2 storey with wrap-around covered front porch, new back deck overlooking the professionally installed tennis court (multi sport surface), detached single car 22 x 24 ft garage with loft are all just some of the features that make this home a retreat. Step into this home from the front porch and you're greeted with warmth and comfort, immediately to your left is a great little den and adjacent to that is the large living room with custom window seating, fireplace insert, open to the dining area all with massive and bright windows. The kitchen has quartz countertops and the large island a butcher block top all with easy access to the walk in pantry for all your kitchen needs. The hallway between the garage and home has plenty of storage and a half bath. Upstairs you'll find 3 large bedrooms, the upper level bathroom and a bonus room above the garage that could be made into a 4th upper level bedroom. The Primary suite has a walk-in closet and full ensuite bath. In the Basement level you'll find another bedroom, a full bath, storage space, a family room and gym space. Looking for more storage, the detached single car garage has a bright loft space perfect for a multitude of uses. The tennis court/multi sport area is fenced and professionally lit with industrial lighting. This large family home is a one owner custom build perfect for all.

Location

18 Pelican, E3E 2L8, Hanwell, NB

Data

Object TypeResidential
Purchase PriceCA$949,900
Living Space0 m²
Plot SizeN/A
Bathrooms4
Construction Year2004
ConditionNot specified
RoomsN/A

Energy Information

Heating TypeHeat Pump - Ducted
Primary Energy SourceN/A
Construction Year2004
Energy CertificateN/A
Final Energy DemandN/A
Certificate Valid UntilN/A
Energy Efficiency ClassN/A

Contact Agent

Listing Agent